
A production line rarely stops because of one dramatic engineering failure. More often, it stops because a machinist can't tell which surface finish applies, a fixture plate was built to the wrong revision, or a supplier interpreted a projection method differently than the design team intended. The drawing looked “close enough” in the office. On...









